Erdenet Mining Corporation LLC
A feasibility study for redeveloping the Erdenet deposit based on revised, approved reserves.
Erdenet, Tsagaan Suvarga, Tavan Tolgoi, Oyu Tolgoi — we have partnered with Mongolia's largest mining projects for over 18 years.
Our experience
We have highlighted, project by project, the work we have delivered since 2006 in geological and mining consulting, detailed design, construction of mine facilities, and contract mining.
Map · Interactive
Our projects have been delivered across 14 provinces of Mongolia. Click on a province to see more details.
A feasibility study for redeveloping the Erdenet deposit based on revised, approved reserves.
Economic analysis for the feasibility study of the project to upgrade Line I of the Erdenet ore preparation plant.
Preparation of a feasibility study for a fluorspar ore processing plant.
Feasibility study for the Senjit Khudag cement plant.
Feasibility study for exploiting the Olon Ovoot 2 deposit.
Preparation of a feasibility study for exploiting an aggregate deposit.
Feasibility study for a wet beneficiation and pig iron plant.
Feasibility study for a coal washing and beneficiation plant.
Feasibility study for a pig iron plant.
Feasibility study for an ANFO explosives plant.
Translation of the full study report for establishing a copper smelter complex.
Feasibility study for the Mongol Shirem project.
Feasibility study for the cast-iron foundry plant of the Dornyn Gan project.
Gold balance calculation.
Process configuration and design for the beneficiation plant of the Olon-Ovoot primary gold deposit.
Building design for a complex recycling scrap aluminum and copper.
Design for camp accommodation, a steam boiler house, a treatment facility, and external/internal utility buildings.
Equipment and building design for a pig iron plant.
Mine planning and design for the Nüürstein Am mine, with complete design for a 150-tonne truck weighbridge.
Design for a 7-storey residential building with commercial space.
Design for an ANFO explosives storage facility.
Master plan and engineering utility networks for a fire-control yard.
Equipment selection calculations for the beneficiation plant of a primary gold deposit.
Building design for the PRIVILEGE training, exhibition, and concert hall.
Power supply for the beneficiation plant, crushing plant, and mine water channel.
Process, equipment, and design for the beneficiation plant of a tin deposit.
Process and design for the beneficiation plant of a primary gold deposit.
Construction of a plant complex (production building, office, sports hall), steam boiler house, and engineering utility networks.
Construction of the tailings storage facility at the Salkhit mine, with HDPE lining and geotextile installation.
Installation of equipment for a pig iron ore plant.
Installation, commissioning, and calibration of a 150-tonne truck weighbridge.
Construction of an 18-tonne explosives storage facility and a 15 t/hour beneficiation plant.
Construction of the Modot tin plant and a 679,850 m³ tailings storage facility (HDPE).
Construction of the beneficiation plant for the Tsagaan Tsakhir primary gold deposit.
Contract mining of coal and overburden stripping at the Tsant-Uul mine.
Excavation of the tailings storage facility and construction of a compacted embankment.
Open-pit contract mining at the Öndörnaran primary gold deposit.
Contract mining at the Nüürstein Am coking coal mine.
Equipment rental for work at a placer gold deposit.
Contract overburden stripping work at the Tavantolgoi mine.
Equipment rental for railway embankment work.